Boeing 787 Dreamliner Achieves Initial Airworthiness Milestone

EVERETT, Wash., Jan. 15 — (PRNewswire) — Boeing (NYSE: BA) has completed initial airworthiness testing on the 787 Dreamliner. This milestone will enable more crew members to take part in flights and will allow more airplanes to join the flight test program.

"This is an important step forward," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "We are very pleased with the results we have achieved so far. The airplane has been performing as we expected."

Since the first flight in mid-December, the program has conducted 15 flights, achieving several key accomplishments. Pilots have taken the airplane to an altitude of 30,000 feet (9,144 meters) and a speed of Mach 0.65. Nearly 60 hours of flying have been completed. Initial stall tests and other dynamic maneuvers have been run, as well as an extensive check-out of the airplane's systems. Six different pilots have been behind the controls of the 787.

In the weeks ahead, the team will continue to expand the flight envelope at which the 787 will operate to reach an altitude of more than 40,000 feet (12,192 meters) and a speed of Mach 0.85. Subsequent testing will push the airplane beyond expected operational conditions.  

"The pilots have told me the results we are seeing in flight match their expectations and the simulations we've run. That's a real tribute to Boeing's expertise and the international team that helped develop and build the airplane," said Fancher.

Flight testing will continue in the months ahead. First delivery is planned for the fourth quarter of this year.

Contact:

Lori Gunter

787 Communications

+1 206 931 5919


SOURCE Boeing

Contact:
Boeing
Lori Gunter, 787 Communications
Phone: +1-206-931-5919
Web: http://www.boeing.com




Review Article Be the first to review this article
SolidCAM - See for yourself


Featured Video
Editorial
Jobs
Mechanical Engineer for Deeter Foundry at Lincoln, Nebraska
Service Software Expert-CATIA & CAA for Dassault Systemes at Shanghai, China
Engineer IV for State of Nebraska at Lincoln, California
Product Design Engineer - Softgoods for Apple Inc at Cupertino, California
Director, Industrial Machinery Solutions- SISW PLM for Siemens AG at Livonia, Michigan
Engineer III - Hydraulics for State of Nebraska at Lincoln, California
Upcoming Events
RAPID + TCT at McCormick Place Chicago IL - Sep 13 - 15, 2021
WESTEC Online at Online CA - Sep 21 - 23, 2021
3D Collaboration & Interoperability Congress at Golden CO - Feb 21 - 24, 2022
Kenesto: 30 day trial



© 2021 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise