TowerJazz Reports Increase in Net Profit

About TowerJazz

Tower Semiconductor Ltd. (NASDAQ:TSEM) (TASE:TSEM) and its subsidiaries operate collectively under the brand name TowerJazz, the global specialty foundry leader. TowerJazz manufactures next-generation integrated circuits (ICs) in growing markets such as consumer, industrial, automotive, medical and aerospace and defense. TowerJazz’s advanced technology is comprised of a broad range of customizable process platforms such as: SiGe, BiCMOS, mixed-signal/CMOS, RF CMOS, CMOS image sensor, integrated power management (BCD and 700V), and MEMS. TowerJazz also provides world-class design enablement for a quick and accurate design cycle as well as Transfer Optimization and development Process Services (TOPS) to IDMs and fabless companies that need to expand capacity. To provide multi-fab sourcing and extended capacity for its customers, TowerJazz operates two manufacturing facilities in Israel (150mm and 200mm), two in the U.S. (200mm) and three facilities in Japan (two 200mm and one 300mm). For more information, please visit www.towerjazz.com.

CONTACTS:
Noit Levy-Karoubi | TowerJazz | +972 4 604 7066 | Noit.levi@towerjazz.com
GK Investor Relations | Gavriel Frohwein, (646) 688 3559 | towerjazz@gkir.com

This press release includes forward-looking statements, which are subject to risks and uncertainties. Actual results may vary from those projected or implied by such forward-looking statements and you should not place any undue reliance on such forward-looking statements. Potential risks and uncertainties include, without limitation, risks and uncertainties associated with: (i) demand in our customers’ end markets; (ii) over demand for our foundry services and/or products that exceeds our capacity; (iii) maintaining existing customers and attracting additional customers, (iv) high utilization and its effect on cycle time, yield and on schedule delivery which may cause customers to transfer their product(s) to other fabs, (v) operating results fluctuate from quarter to quarter making it difficult to predict future performance, (vi) impact of our debt and other liabilities on our financial position and operations, (vii) our ability to successfully execute acquisitions, integrate them into our business, utilize our expanded capacity and find new business, (viii) fluctuations in cash flow, (ix) our ability to satisfy the covenants stipulated in our agreements with our lender banks and bondholders (as of September 30, 2017 we are in compliance with all such covenants included in our banks’ agreements, bond G indenture and others), (x) pending litigation, including the shareholder class actions that were filed against the Company, certain officers, its directors and/or its external auditor in the US and Israel, following a short sell thesis report issued by a short-selling focused firm, which has been dismissed and closed in the US and is still pending in Israel; (xi) our majority stake in TPSCo and our acquisition of the San Antonio fabrication facility by TowerJazz Texas (“TJT”), including new customer engagements, qualification and production ramp-up, (xii) the closure of TJP within the scope of restructuring our activities and business in Japan, settling any future claims or potential claims from third parties, (xiii) meeting the conditions set in the approval certificates received from the Israeli Investment Center under which we received a significant amount of grants in past years, (xiv) receipt of orders that are lower than the customer purchase commitments, (xv) failure to receive orders currently expected, (xvi) possible incurrence of additional indebtedness, (xvii) effect of global recession, unfavorable economic conditions and/or credit crisis, (xviii) our ability to accurately forecast financial performance, which is affected by limited order backlog and lengthy sales cycles, (xix) possible situations of obsolete inventory if forecasted demand exceeds actual demand when we manufacture products before receipt of customer orders, (xx) the cyclical nature of the semiconductor industry and the resulting periodic overcapacity, fluctuations in operating results and future average selling price erosion, (xxi) the execution of debt re-financing and/or fundraising to enable the service of our debt and/or other liabilities, (xxii) operating our facilities at high utilization rates which is critical in order to cover a portion or all of the high level of fixed costs associated with operating a foundry, and our debt, in order to improve our results, (xxiii) the purchase of equipment to increase capacity, the timely completion of the equipment installation, technology transfer and raising the funds therefor, (xxiv) the concentration of our business in the semiconductor industry, (xxv) product returns, (xxvi) our ability to maintain and develop our technology processes and services to keep pace with new technology, evolving standards, changing customer and end-user requirements, new product introductions and short product life cycles, (xxvii) competing effectively, (xxviii) use of outsourced foundry services by both fabless semiconductor companies and integrated device manufacturers; (xxix) achieving acceptable device yields, product performance and delivery times, (xxx) our dependence on intellectual property rights of others, our ability to operate our business without infringing others’ intellectual property rights and our ability to enforce our intellectual property against infringement, (xxxi) retention of key employees and recruitment and retention of skilled qualified personnel, (xxxii) exposure to inflation, currency rates (mainly the Israeli Shekel and Japanese Yen) and interest rate fluctuations and risks associated with doing business locally and internationally, as well fluctuations in the market price of our traded securities, (xxxiii) issuance of ordinary shares as a result of conversion and/or exercise of any of our convertible securities, as well as any sale of shares by any of our shareholders, or any market expectation thereof, which may depress the market price of our ordinary shares and may impair our ability to raise future capital, (xxxiv) meeting regulatory requirements worldwide, including environmental and governmental regulations; (xxxv) negotiation and closure of a definitive agreement in relation to the fab establishment in China, as well as implementation of this project through required funding and resources and receipt of future proceeds therefrom; and (xxxvi) business interruption due to fire and other natural disasters, the security situation in Israel and other events beyond our control such as power interruptions.  

A more complete discussion of risks and uncertainties that may affect the accuracy of forward-looking statements included in this press release or which may otherwise affect our business is included under the heading "Risk Factors" in Tower’s most recent filings on Forms 20-F and 6-K, as were filed with the Securities and Exchange Commission (the “SEC”) and the Israel Securities Authority. Future results may differ materially from those previously reported. The Company does not intend to update, and expressly disclaims any obligation to update, the information contained in this release.

(Financial tables follow)

TOWER SEMICONDUCTOR LTD. AND SUBSIDIARIES 
CONDENSED CONSOLIDATED BALANCE SHEETS 
(dollars in thousands) 
           
           
        September 30,  December 31, 
        2017  2016 
            (unaudited)      
A S S E T S            
                     
  CURRENT ASSETS            
    Cash, cash equivalents and short-term deposits $ 480,407 $ 389,377  
    Marketable securities     49,738     --    
    Trade accounts receivable   150,039   141,048  
    Inventories     143,300   137,532  
    Other current assets     21,465   30,041  
      Total current assets     844,949   697,998  
                     
  LONG-TERM INVESTMENTS   27,091   25,624  
                     
  PROPERTY AND EQUIPMENT, NET   633,107   616,686  
                     
  INTANGIBLE ASSETS, NET   21,627   28,129  
                     
  GOODWILL     7,000   7,000  
                     
  OTHER ASSETS, NET     18,484   4,447  
                     
      TOTAL ASSETS   $ 1,552,258 $ 1,379,884  
                     
                     
LIABILITIES AND SHAREHOLDERS' EQUITY          
                     
  CURRENT LIABILITIES            
    Short-term debt   $ 45,664 $ 48,084  
    Trade accounts payable     109,385   99,262  
    Deferred revenue and customers' advances   26,454   26,169  
    Other current liabilities     64,259   73,600  
      Total current liabilities     245,762   247,115  
                     
  LONG-TERM DEBT     295,485   296,144  
                     
  LONG-TERM CUSTOMERS' ADVANCES   37,674   41,874  
                     
  LONG-TERM EMPLOYEE RELATED LIABILITIES   14,170   14,176  
                     
  DEFERRED TAX LIABILITY AND OTHER LONG-TERM LIABILITIES   85,380   97,961  
                     
      TOTAL LIABILITIES     678,471   697,270  
                     
      TOTAL SHAREHOLDERS' EQUITY   873,787   682,614  
                     
        TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY $ 1,552,258 $ 1,379,884  
                     

« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7  Next Page »
Featured Video
Editorial
Jobs
Advanced Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Engineer for PTEC Solutions at Fremont, California
Mechanical Engineering Technical Leader for Cisco Systems Inc at San Jose, California
Senior Software Engineer (GIS) for SeeScan, Inc. at San Diego, California
Upcoming Events
Altair - Simulate at the Speed of Design 2024 at United States - May 16, 2024
Smart Manufacturing Experience 2024 at David L. Lawrence Convention Center Pittsburgh PA - Jun 4 - 5, 2024
SprutCAM X World Conference at Cyprus - Jun 10 - 13, 2024
Welcome to FABTECH Canada 2024 at The Toronto Congress Centre (South Building) 650 Dixon Road Toronto Ontario Canada - Jun 11 - 13, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise